A small portion of Southwest Survey Solutions most noteworthy projects

  • Solar Farms
    Solar Farms
  • Solar Farms
    Solar Farms
    S3 has been on multiple solar farms ranging from 18MWac to550MWac. Due to confidentiality agreements we are not allowed to elaborate on these projects.
    Read More
  • Marana Landfill
    Marana Landfill
  • Marana Landfill
    Marana Landfill
    S3 worked with CSWt to construct a brand new landfill, including cell construction, offsite improvements and access road construction at what will be the Marana Regional Landfill. The scope of work for this project included 2,152,442 cy of mass excavation; 15 acres of subgrade prep; 1 mile of access road construction; 5,400 tons of asphalt paving; 1,500 lf of HDPE piping; 12,000 lf of fencing; 47,000 cy of operations layer placement; 10,000 tons of rip rap; and offsite roadway improvements.
    Read More
  • Taxiway G&H
    Taxiway G&H
  • Taxiway G&H
    Taxiway G&H
    The Airfield Utility Access Upgrades completed as part of this project were located within Taxiway “G” and Taxiway “H” infields, areas south of Taxiway “G” and areas adjacent to the South Air Cargo apron. The project improvements included adjusting (raising) existing electrical and communication utility vaults, raising existing sanitary sewer manholes, raising existing storm drain manholes, and addition of new storm drainage infrastructure to provide positive drainage near utility vaults. The dirt infield areas were approximately 200 feet in width and length varied to 1,400 feet.
    Read More
  • Phoenix Goodyear Airport
    Phoenix Goodyear Airport
  • Phoenix Goodyear Airport
    Phoenix Goodyear Airport
    This project consists of repairs to Portland Cement Concrete pavement at each end of the Runway 3/21 at Phoenix Goodyear Airport. The scope of work is to include joint resealing of 32,704 LF, crack sealing of 500 LF, partial depth repairs, and the installation of pavement markings totaling 28,000 LF. The project is part of ADOT Aeronautics’ Pavement Maintenance Program.
    Read More
  • El Sobrante Landfill and Recycling Center 9B&10
    El Sobrante Landfill and Recycling Center 9B&10
  • El Sobrante Landfill and Recycling Center 9B&10
    El Sobrante Landfill and Recycling Center 9B&10
    Phases 9B and 10, at El Sobrante for Waste Management in Corona, California. The project required soil excavation, site grading, subgrade preparation, compaction and finish grading. Within our scope of work was the construction of a J-stand; control of storm water erosion; construction of a sub-drain system; transport, placement and compaction of a clay liner; construction of a vadose zone monitoring sump; a UV protective layer and ballast system; and placement of LCRS gravel and piping.
    Read More
  • Mesilla Levee Phase II
    Mesilla Levee Phase II
  • Mesilla Levee Phase II
    Mesilla Levee Phase II
    S3 provided subcontracting services for earthwork on the Mesilla Levee, Phase II in New Mexico. The 19-mile rehabilitation and modification project is along an existing floodway levee of the Rio Grande River. The improvements consisted of: 1) clay platting of 2’ on the top and riverside portions of levee to raise the top-of levee elevation; 2) modification the levee slopes through the use of seepage control structures to control through-seepage and under-seepage; and 3) rehabilitation of the existing pipeline/culvert structures and appurtenances located within the levees by modifying them to be in accordance with the raised levee cross-section, repair of gates and gatewells and the addition of gates to ungated structures..
    Read More
  • S3 has worked with waste Management for 8 years in Arizona, New Mexico and California.
    Read More
  • City JOC Projects
    City JOC Projects
  • City JOC Projects
    City JOC Projects
    S3 works with a few contractors performing hundreds of small jobs a year around the cities including Mesa, Gilbert, Chandler Peoria, Glendale, Coolidge, and more.
    Read More
  • Intrepid Potash Mine Construction
    Intrepid Potash Mine Construction
  • Intrepid Potash Mine Construction
    Intrepid Potash Mine Construction
    Intrepid Potash Mine Construction S3 worked with CSW to construct 500 acres of evaporation ponds. The work includes: 3,800,000 cy of mass excavation; 2,800,000 sy of subgrade prep; 1,100,000 cy of imported protective cover material.
    Read More
  • Mercedes-Benz Test Track
    Mercedes-Benz Test Track
  • Mercedes-Benz Test Track
    Mercedes-Benz Test Track
    S3 worked with CSW on the excavation and subgrade prep as this new Belgian Block Test Track for Mercedes Benz is designed and built. Other tasks included the asphalt paving for the access roadway.
    Read More
  • Pinnacle Peak Road 55th Ave-35th Ave
    Pinnacle Peak Road 55th Ave-35th Ave
  • Pinnacle Peak Road 55th Ave-35th Ave
    Pinnacle Peak Road 55th Ave-35th Ave
    S3 worked at the Pinnacle Peak Road CMAR project which included constructing full major street improvements between 55th Avenue to 35th Avenue. The length of the project is 2.85 miles. The projects construction improvements consisted of, but not limited to: new asphalt paving; concrete curb and gutter; concrete sidewalks; catch basins; storm drain pipe; concrete box culvert crossings; drainage structures; erosion protection; basin grading; lot fill grading and roadway embankment
    Read More
  • San Carlos Medical Center Wet Utilities
    San Carlos Medical Center Wet Utilities
  • San Carlos Medical Center Wet Utilities
    San Carlos Medical Center Wet Utilities
    This project included wet utilities for the new San Carlos Medical Center in Peridot, AZ. 9,400 LF water main piping 6,200 LF sewer main piping 1,600 LF storm drain piping associated concrete structures
    Read More
  • Flagstaff-Holbrook I-40 Reconstruction
    Flagstaff-Holbrook I-40 Reconstruction
  • Flagstaff-Holbrook I-40 Reconstruction
    Flagstaff-Holbrook I-40 Reconstruction
    This $5.8-million project included reconstruction of westbound I-40 through the removal of some rolling hill grades, realignment the westbound lanes and the westbound on- and off-ramps at Cosnino Road, the installation of new guardrails, pavement markings, signage and other related work
    Read More
  • Genral Motors Proving Grounds
    Genral Motors Proving Grounds
  • Genral Motors Proving Grounds
    Genral Motors Proving Grounds
    S3 helped Genral Motors move the facilites from Pheonix to just outside of Yuma. We have been working on and off on the new site for the last few years.
    Read More

S3 Arizona

24695 S 195th Way

Queen Creek AZ, 85142

Phone 480-522-6661